WHAT: Plant Maintenance of Philhydro
WHEN: December 17-18, 2024, 6pm to 8am (14hrs)
AFFECTED AREA/S: *Caypombo, *Caysio, *Bulac, M. Sapa, Silangan, Balasing, Catmon, Pulong Buhangin, Patag, Poblacion, Tabing Bakod, San Gabriel, Mahabang Parang, Camangyanan, Bagbaguin (Brgys with * are most affected)
WHAT TO EXPECT: Low Pressure to Zero SupplyWe apologize for the inconvenience.
