SMWD Advisory WI2410-0266

WHAT: Emergency Mainline Leak Repair WHEN: October 17, 2024 | 10pm to 3am (5 hours) AFFECTED AREA/S: Guyong WHAT TO EXPECT: Low Pressure to Zero Supply Please store enough supply to use before the said activity. Thank you.

SMWD Advisory WI2410-0265

WHAT: Monthly flushing activity on sidestreets and mainlines (as part of water quality maintenance)WHEN: October 12, 2024 | 8pm to 5am (9 hours)AFFECTED AREA/S: Guyong, Poblacion, Caysio, Bagbaguin, Manggahan (Amaia), Mahabang Parang, San Gabriel, Sto. Tomas, CamangyananWHAT TO EXPECT: Turbid water, Low Pressure to Zero Supply Please store enough supply to use before the said continue reading : SMWD Advisory WI2410-0265

SMWD Advisory WI2410-0264

WHAT: Disconnect at Tapping Due to Transfer of MeterWHEN: October 11, 2024 | 8pm to 10PM (2 hours)AFFECTED AREA/S: Guyong (Celeste St.)WHAT TO EXPECT: Low Pressure to Zero Supply Please store enough supply to use before the said activity. Thank you.

SMWD Advisory WI2410-0263

WHAT: Disconnect at Tapping Due to Rehabilitation- Outmove of 14 MetersWHEN: October 11, 2024 | 8pm to 12AM (4 hours)AFFECTED AREA/S: GuyongWHAT TO EXPECT: Turbid water, Low Pressure to Zero Supply Please store enough supply to use before the said activity. Thank you.

SMWD Advisory WI2410-0261

WHAT: Monthly flushing activity on sidestreets and mainlines (as part of water quality maintenance)WHEN: October 10, 2024 | 8pm to 5am (9 hours)AFFECTED AREA/S: Sta. Clara, Manggahan, Sta. Cruz, Lalakhan, Patag, PoblacionWHAT TO EXPECT: Turbid water, Low Pressure to Zero Supply Please store enough supply to use before the said activity. Thank you.

SMWD Advisory WI2410-0260

WHAT: Monthly flushing activity on sidestreets and mainlines (as part of water quality maintenance)WHEN: October 9, 2024 | 8pm to 5am (9 hours)AFFECTED AREA/S: Patag, Catmon, Bulac, Guyong, Pulong BuhanginWHAT TO EXPECT: Turbid water, Low Pressure to Zero SupplyPlease store enough supply to use before the said activity. Thank you.

SMWD Advisory WI2410-0259

WHAT: Drainage Project and Pipe Realignment of 300mm Upvc Pipeline Due to Drainage ProjectWHEN: October 9, 2024 | 8pm to 5am (9 hours)AFFECTED AREA/S: Balasing, Bulac, CatmonWHAT TO EXPECT: Low Pressure to Zero SupplyPlease store enough supply to use before the said activity. Thank you.