WHAT: Shutdown of PhilHydro Plant
(Cleaning of the 7 reservoir at the Booster Station, repair and maintenance of 2 sets of pump and motor at the Intake Pumping Station, replacement of 300mm gate valve at the Water Treatment Plant, assessment and maintenance of the ATS circuit breaker at the Intake Pumping Station)

WHEN: JuLY 2-3, 2024 | 6pm to 12nn (16 hours)

AFFECTED AREA/S: Pulong Buhangin, Silangan, Mag-asawang Sapa, Caypombo, Caysio, Guyong, Balasing, Bulac, Catmon, San Jose Patag, Poblacion, Bagbaguin, Sto. Tomas, Mahabang Parang, San Gabriel

WHAT TO EXPECT: Low Pressure to Zero Supply

Please store enough water to use before the said activity. Thank you.